[[Include(WikiToC)]] == Deployment Map === Current Outdoor Sites === #sites_current ||='''Abbreviation'''=||='''Site'''=||='''Description'''=||='''Location'''=|| || co1 || core 1 || CU CS Building CRF compute || [https://www.google.com/maps/place/Seeley+W.+Mudd+Building/@40.8095488,-73.9602526,15z/data=!4m5!3m4!1s0x0:0x5891c65b9ba2dc24!8m2!3d40.8095488!4d-73.9602526 map] || || co2 || core 2 || Datacenter at 32 Avenue of the Americas || [https://www.google.com/maps/place/32+6th+Ave,+New+York,+NY+10013 map] || || lg1 || large 1 || CU Mudd building 18th floor rooftop || [https://www.google.com/maps/place/40%C2%B048'33.8%22N+73%C2%B057'36.6%22W map] || || md1 || medium 1 || CU Mudd building 1st floor (120th Street) || [https://www.google.com/maps/place/40%C2%B048'33.9%22N+73%C2%B057'35.1%22W map] || || md2 || medium 2 || CU Mudd building 2nd floor (Amesterdam Ave) || [https://www.google.com/maps/place/40%C2%B048'33.0%22N+73%C2%B057'34.4%22W map] || ''CU - Columbia University'' === Current and Upcoming sites The pilot phase in the figure below (which includes the sites above) was completed in May 2019. Phase 1 completion date was planed for the end of 2020 but now depends on NYC and NYS re-opening following COVID-19. The full envisioned deployment is illustrated in Phase 2. [[Image(COSMOS_phases_20190822.jpg, width=500em)]] === Availability status per node (radio / edge / compute) === Link status between fixed sites