Changes between Version 10 and Version 11 of Workshops/Sig Comm2022/Optical Tutorial


Ignore:
Timestamp:
Aug 3, 2022, 4:06:12 PM (22 months ago)
Author:
tingjunchen
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Workshops/Sig Comm2022/Optical Tutorial

    v10 v11  
    3434
    3535= Experiment_1 Context =
    36  || [[Image(Experiment_1.png, width=500px)]] ||
    37 Fig.1 Logical Topology of Experiment_1
     36|| [[Image(sigcomm2022tutorial_topology.png, width=500px)]] ||
     37Figure 1. Topology setup of the experiment.
    3838
    3939Experiment consists in changing the light path from ToR1<-->ToR2 to ToR1<-->ToR3, representing changing of the light path in C-RAN when “Client” wants to move its base-band processing from “Edge Cloud” to “Central Cloud”.