Changes between Version 9 and Version 10 of Architecture/Deployment/Measurements/s1-lg1


Ignore:
Timestamp:
Aug 29, 2022, 2:48:32 AM (2 years ago)
Author:
it2304
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Architecture/Deployment/Measurements/s1-lg1

    v9 v10  
    1111
    1212==== Coverage
    13 [https://wiki.cosmos-lab.org/wiki/Architecture/Deployment/Measurements Coverage measurements] were performed around the node area in July 2021 and Summer 2022. More than 700 measurements were taken along Amsterdam avenue, as well as the along 120th to 122nd street and the housing projects by 123rd street. The measurement results are presented below.
     13[https://wiki.cosmos-lab.org/wiki/Architecture/Deployment/Measurements Coverage measurements] were performed around the node area in July 2021 and Summer 2022. More than 700 measurements were taken along Amsterdam avenue, as well as the along 120th to 122nd street and the Morningside Gardens and Grant house buildings by 123rd street. The measurement results are presented below.
    1414
    1515 |||||| Figure 2: Coverage measurement results for {{{s1-lg1}}}. ||
     
    1818
    1919The measurements show coverage upto half way between 129th and 130th street along Amsterdam avenue, receiving over -80 dBm RSSI. Coverage also ranges upto Riverside Drive along 120th street with around -85 dBm RSSI.
    20 
    21 ==== Future Work
    22 
    23 Further measurements along the sidewalks from 123rd to 129th street.