Changes between Version 13 and Version 14 of Tutorials/4G5G/Inter Digital-5G


Ignore:
Timestamp:
May 1, 2020, 5:56:52 PM (4 years ago)
Author:
mackjx
Comment:

Legend:

Unmodified
Added
Removed
Modified
  • Tutorials/4G5G/Inter Digital-5G

    v13 v14  
    147147}}}
    148148
    149 The two scripts will start the appropriate firmware on both NR Platform devices. The NR Platform will automatically “connect” a link between the gNB and UR. This can be verified via the NR GUI.
     149The two scripts will start the appropriate firmware on both NR Platform devices and the script "stop_all.sh" can be used to terminate execution. The NR Platform will automatically “connect” a link between the gNB and UR. This can be verified via the NR GUI.
    150150
    151151=== Check the Routing ===
     
    199199 * In the gNodeB session strat the iperf client
    200200{{{
    201 iperf3 -c 192.168.2.2 -i 1 -u -b 20M -l 1472 -t 3
     201iperf3 -c 192.168.2.2 -i 1 -u -b 20M -l 1472 -t 30
    202202}}}
    203203