Deployment Map

Current Outdoor Sites

AbbreviationSiteDescriptionLocation
co1 core 1 CU CS Building CRF compute map
co2 core 2 Datacenter at 32 Avenue of the Americas map
lg1 large 1 CU Mudd building 18th floor rooftop map
md1 medium 1 CU Mudd building 1st floor (120th Street) map
md2 medium 2 CU Mudd building 2nd floor (Amesterdam Ave) map

CU - Columbia University

Current and Upcoming sites

The pilot phase in the figure below (which includes the sites above) was completed in May 2019. Phase 1 completion date was planed for the end of 2020 but now depends on NYC and NYS re-opening following COVID-19. The full envisioned deployment is illustrated in Phase 2.

Availability status per node (radio / edge / compute)

Link status between fixed sites