wiki:Architecture/Deployment

Version 33 (modified by mpk2138, 4 years ago) ( diff )

Site Navigation

  1. COSMOS Testbed Overview
    1. Concepts
    1. Testbed Workflow
    1. Availability and Resource Status
    1. Events and Conferences
  2. Getting Started
    1. Make an Account
    2. Create and Configure SSH Keys
    3. Make a Reservation
    4. Log in to your Reservation
    5. Control Resources with OMF
    6. Run a Hello World Experiment
    7. Get Help and Support
  3. COSMOS/ORBIT User Guide
    1. The COSMOS Portal
    2. Connecting to the Testbed
    3. Running Experiments
    4. Policies and Support
    5. Quick Links
    1. Policies
    1. Account Creation
    1. Camera Streaming
    1. Scheduling and Reservations
    1. Disk Images
    1. Frequently Asked Questions
    1. Resource Control with OMF
  4. COSMOS Portal
    1. Your First Visit
    2. Setting Up Your Account
    3. Reserving Testbed Time
    4. Monitoring Your Experiment
    5. Connecting via SSH
    6. Managing Disk Images
    7. Joining the Community
    8. Browsing Users and Groups
    9. Tips
  5. Account Management
    1. Edit Profile
    2. Change Password
    3. SSH Keys
  6. Portal Dashboard
    1. Profile Card
    2. Usage Statistics
    3. Community Forum
  7. Directory
    1. Users
    2. Groups
    3. Privacy Note
  8. Disk Images
    1. Browsing Images
    2. Image Details
    3. Searching and Sorting
    4. Managing Your Images
    5. Baseline Images
    6. Saving Custom Images
    7. Storage and Retention
  9. Community Forum
    1. Accessing the Forum
    2. Forum Categories
    3. How to Use the Forum
    4. Forum Etiquette
    5. Privacy and Access
  10. Getting Started with the COSMOS Portal
    1. Creating an Account
    2. Logging In
    3. What to Do After Logging In
  11. SSH Access to Testbed Nodes
    1. Access Model
    2. Console Servers
    3. Basic Connection
    4. SSH Config File
    5. SSH Tunneling
    6. File Transfer
    7. Troubleshooting
  12. Scheduler
    1. Calendar View
    2. Reservation Colors
    3. Creating a Reservation
    4. Competing for a Slot
    5. Modifying or Canceling Reservations
    6. My Reservations
    7. Resource Information
  13. Testbed Status
    1. Node Status Grid
    2. RF Matrix Control (SB4)
    3. Understanding Node States During Experiments
    1. Remote Access
    1. Chrome Remote Desktop Setup Page
  14. Installing Chrome Remote Desktop (CRD) on a Custom Image
    1. Measurement & Result Collection
    1. Storage
    1. Support
    1. Contributing to the Wiki
  15. Tutorials
    1. SDR and Wireless
    2. Wireless Digital Twins
    3. Optical Networking
    4. Wired Networking
    5. Edge Computing
    6. 4G/5G Systems
    7. Orchestration Platforms
  16. Architecture
    1. Data Flow
    1. Deployment Map
    1. Domains
    1. Naming Convention
    1. Networks
    1. Optical
  17. Resources, Services and APIs
    1. RF Control
    2. SDR Control
    3. Compute Control
    4. Network Control
    5. Optical Control
  18. Datasets
  19. Hardware Info
    1. Cameras
    1. Compute
    1. FR3 SDRs
    1. Network
    1. Nodes
    1. Optical
    1. RF Subsystems
    1. Antennas
    1. Full-Duplex Radio
    1. RF Front End
    1. Software Defined Radios (SDR)
  20. RF Policies & Compliance
    1. Outdoor Radio Frequency Allocation
    2. Program Experiment License
    3. Spectrum Monitoring
    4. Emergency Stop Procedures
    5. Network and Platform Security

Deployment Map

Current Outdoor Sites

Map locations and GPS coordinates are only approximate and for rough reference only.

AbbreviationSiteDescriptionLocationMeasurement
co1 core 1 CU CS Building CRF compute map
co2 core 2 Datacenter at 32 Avenue of the Americas map
lg1 large 1 CU Mudd building 18th floor rooftop map s1-lg1,s2-lg1, s3-lg1
md1 medium 1 CU Mudd building 1st floor (120th Street) map md1
md2 medium 2 CU Mudd building 2nd floor (Amsterdam Ave) map md2

CU = Columbia University

Coverage measurements of the outdoor nodes when transmitting 802.11g WiFi data packets at 2.412 GHz are described here.

Current and upcoming sites

The figure below shows COSMOS’ envisioned deployment area of about 1 sq. mile covering about 15 city blocks and about 5 city avenues, with tentative deployment sites marked on the map.

The pilot phase in the figure below (which includes the sites above) was completed in May 2019. Phase 1 completion date was planed for the end of 2020 but now depends on NYC and NYS re-opening following COVID-19. The full envisioned deployment is illustrated in Phase 2.

Attachments (4)

Note: See TracWiki for help on using the wiki.